This month saw Practical Completion of Block B Factory for Carlisle Fluid Technology (UK) Ltd in Poole.
Existing services were stripped out of their existing 2,530m2 warehouse and new heating, ventilation, lighting power, coms, compressed air, water and gas were designed for a factory fit-out with more specific mechanical ventilation with heat recovery and VRV air condition to serve a two storey office space built inside the factory.
Worldwise did a load assessment for gas, water and electrical demands in the fit out area. An upgrade of gas and electrical supplies resulted for the whole site, with new services extended to Factory B. A new 630A switchpanel board, 400A busbar trunking distribution, lighting, emergency lighting, high level busbar trunking for small and motive power was designed and specified by Worldwise with existing , fire alarm, CCTV and comms cabling systems extended. New , gas-fired unit heaters, air source heat pumps for offices and dehumidification to two product preparation areas were detailed along with a compressed air backbone distribution was a designed as a co-ordinated package for fast installation on site.
