A failed oil-fired boiler and damaged chimney meant that there was no heating available in the Grade 2 Listed, 15th century church. The building fabric was deteriorating and the congregation ...
Conversion of a Grade 2 listed Carmelite Convent to a sixth form residential and learning centre for physically challenged people. Services include the installation of a lift, accessible entrance, LST ...
Various schemes undertaken on the campus included fire and alarm and emergency lighting on the ground floor of the main Grade 2 listed building, implementation of a fire detection and ...
The project comprised the conversion of a derelict Mill located adjacent to a river and had the following special considerations to be addressed as part of the design :- Grade ...
Initially engaged to undertake a feasibility study on replacing the all electric infra red heating system for this 275m2 Grade 2 Listed church a report was produced that considered all ...
Phase 1, Visitor Centre Problems with the power supply serving both Christchurch Priory and Priory House meant that something needed to be done if a larger kitchen, a lift and ...
Having had their boiler condemned due to asbestos presence in its flue and the fact that the basement boiler room routinely flooded in wet weather, the Parish Council asked Worldwise ...
Our brief was to report on the potential for improving thermal comfort, increasing energy efficiency and reducing running costs associated with the heating system on site. The Grade 2 Listed ...
This Grade 2 Listed 670m2 building had major work done to it in 2000 when the nave had a partition installed to create a foyer with kitchen, office, toilet and ...
Complete refurbishment of part lower ground and ground floors in Grade 2 Listed landmark building to form a state of the art drama centre with two studios, changing village and ...
Phase 1 – Nursery & Parish Centre Conversion As part of a rationalisation plan for property in the parish consideration is being given to converting the lower ground floor level ...
Phase 1 of this project comprised a complete refurbishment of a derelict Grade 2 Listed farmhouse building with its cartshed, a remote plantroom and office in adjacent farm buildings and ...
The demolition of the existing basics bank and community areas at the rear of the church and their replacement with a new 208m2 parish centre with kitchen, crèche, meeting room, ...
A 225m2 church built in 1841 with a community space extended onto the rear during the 1960-70’s. The church is Grade 2 Listed and sits on a very prominent site ...
Conversation of a Victorian listed school building into an exciting, vibrant, training centre for community learning and adult education plus office accommodation for Adult Education staff in the heart of ...
Behind the Sacred Heart Church in Bournemouth is what used to be its presbytery. This has become Bournemouth Oratory and comprises 780m2 over 4 floors (including the basement) incorporating 10 ...