A failed oil-fired boiler and damaged chimney meant that there was no heating available in the Grade 2 Listed, 15th century church. The building fabric was deteriorating and the congregation ...
This project comprised the removal of a tired toilet block and the provision of a new welcome centre for visitors to Upton Country Park. As a part Lottery funded project, ...
The building was originally constructed in 1970. It was upgraded in 1990 and our involvement came with the 2019 complete refurbishment. It comprises 497m2 day centre designed primary for people ...
Initially engaged to undertake a feasibility study on replacing the all electric infra red heating system for this 275m2 Grade 2 Listed church a report was produced that considered all ...
Having had their boiler condemned due to asbestos presence in its flue and the fact that the basement boiler room routinely flooded in wet weather, the Parish Council asked Worldwise ...
Our brief was to report on the potential for improving thermal comfort, increasing energy efficiency and reducing running costs associated with the heating system on site. The Grade 2 Listed ...
This Grade 2 Listed 670m2 building had major work done to it in 2000 when the nave had a partition installed to create a foyer with kitchen, office, toilet and ...
Phase 1 – Nursery & Parish Centre Conversion As part of a rationalisation plan for property in the parish consideration is being given to converting the lower ground floor level ...
The demolition of the existing basics bank and community areas at the rear of the church and their replacement with a new 208m2 parish centre with kitchen, crèche, meeting room, ...
A 225m2 church built in 1841 with a community space extended onto the rear during the 1960-70’s. The church is Grade 2 Listed and sits on a very prominent site ...
Behind the Sacred Heart Church in Bournemouth is what used to be its presbytery. This has become Bournemouth Oratory and comprises 780m2 over 4 floors (including the basement) incorporating 10 ...
The refurbishment of a 40 bed shelter for homeless people including shared dining room, kitchen, medical, administration, IT training and gym facilities. Engaged to generate a Performance Specification with outline ...
Fully detailed designs were prepared for an upgrade of the gas supply to accommodate new kitchen and complete new heating system to serve nursery, church and community spaces with creation ...
A new build 430m2 multi-use community centre providing office accommodation for the local parish council, a meeting room, 30 place nursery, kitchen, café, 120 seat multi-purpose hall, toilets and designed ...
Refurbishment and extension of church hall facility to create 450m2 of space for community group lettings. It comprises three large meeting spaces and a large hall with commercial grade kitchen ...
A new build 392m2 church with flexible balcony space for potential lettings, large foyer, worship area, vestry, flower room, toilets and large kitchen. This building is intended to act as ...
The project comprised a new build 1,030m2 single storey church with parish centre and a 250m2 two storey presbytery. The church can seat up to 400 people and is expandable ...
The community aspect of this building may not be immediately apparent but it includes facilities for Sure Start, a café, two meeting rooms, an interview room, recording studio and, oh ...
Worldwise Limited was engaged to produce a detailed design, specification and drawings and full site visit roles for all the mechanical and electrical services systems for this shell and fit-out ...